The roof is done.
The crew arrived early on Wednesday — only minutes after I popped a fresh SD card into my time-lapse camera and started it up. Now that the days are very long — we get almost 16 hours of sunlight, and even more light if you include twilight hours — and starting to get very warm, the builders want to work early. They asked if they could come as early as 5 AM and I told them they could — heck, I’m awake at that time. They rolled into my driveway at about 5:40 AM. The earlier they start, the earlier they can leave.
The day was perfect for construction on a rooftop — very little wind and relatively cool. As usual, the crew got right to work. I was home all day, doing odd jobs around the yard and working on a writing project on my computer. I came out a few times for a peek at where they were, amazed, as usual, at how quickly this “well-oiled machine” worked.

At one point, I climbed up onto the roof of the RV for a better look at what they’d done — and a photo, of course.
They finished the metal on top of the roof before lunch. Afterwards, they went back outside and worked on the trim, which I’m sure has a special construction name I’m not aware of.
And then they left.
Afterwards, I repositioned the man-lift and used it to go up to the second floor. I was meeting with a builder to start getting bids on the framing job and wanted another look around before he arrived. With the roof on, the building was beginning to really feel like the big shelter it would soon be.

Another look from the second floor, this time with the roof on. There’s no insulation under this roof yet; it’ll be done with the framing and drywall. The framers will put a wall between the second floor and the shop. I’ve decided to leave the roof beams (but not the purlins, of course) exposed.
Once again, the time-lapse camera isn’t in the best position to see exactly what they did. But you can watch them progress from left to right across the rooftop and then see them put up the trim.